Western Paving plans to seal the asphalt in the school parking lots on Oct. 15-18. Several areas will be repaved, including places in front of the Peoples Church sanctuary and the East Drive.
Sections of the East Drive will be unavailable on the 15th and 16th. Those planning to enter from Fir St. should find a different route; entering through the main center drive between the flag poles is recommended.
At Buildings 3, 5 and 9, there will be signs directing students and parents to the east side of the campus.
On the 17th and 18th, the main drive running east and west in front of the sanctuary will be getting sealed and dried. There will be limited parking by the Worship Ministries Center and G.L. Johnson Chapel.
On the west side of the G.L. Johnson Chapel, traffic will flow everyday during the roadwork.
Caution is necessary during all times but especially in the dark hours when signs and caution tape are not as easily visible.
Be sure to stay outside the caution tape in case of tracking the black sealant into unwanted areas.
According to Willard Neufeld, Peoples Church facility manager, all cooperation is greatly appreciated.